PRINCIPALES CARACTÉRISTIQUES
STRUCTURE OPTIMISÉE

LOW ENERGY
CONSUMPTION

DURABILITÉ
& RETOUR SUR INVESTISSEMENT RAPIDE

LOW MAINTENANCE
& HIGH DURABILITY

STRUCTURE BOIS
CERTIFIEE FSC

TYPHOON
RESISTANT

DELIVERY IN 2D MODULES
TO BE ASSEMBLED ON SITE
LIVRAISON EN KIT (Préfabrication en Atelier)

INSTALLATION
INSTALLATION

CLEAN CONSTRUCTION
PRESERVED THE SITE

DÉMONTABLE (option)

ADAPTÉ TO NATURAL
or REMOTE AREAS
CALENDRIER PREVISIONNEL
CUSTOMISATION /PERSONNALISATION
FABRICATION
INSTALLATION
CUSTOMISATION /PERSONNALISATION
6 A 8 SEMAINES
En Fonction des options
& needs of Design customization
PREFABRICATION
10 KEYS => 6 WEEKS
En Fonction des options
& Mission Kanopya pour votre projet
INSTALLATION
10 KEYS – 5 WEEKS
20 KEYS – 8 to 10 WEEKS
Installation time varies depending on the options chosen by the client: Assembly by the Kanopya team (option 1); Supervision by the Kanopya team (option 2); Training of the client’s team by Kanopya (option 3).

VALIDATION COMMANDE

VALIDATION
DU DESIGN FINAL

PACKING &
& TRANSPORT*